SAFTI FIRST - GPX Builders Series Fire Protective Framing System

DOWNLOADS

20 to 45 minute fire protective framing system available in multiple profiles. Offered in standard and custom finishes including high performance fluoropolymer finishes by PPG, stainless steel, and more. Fire Protective Doors 20 to 45 minute fire protective, doors. Tested to NFPA 252, Fire Tests of


Category: fire rated borrowed lights | fire rated door frames | fire rated glazed assemblies...

MasterFormat: Hollow Metal Doors and Frames | Entrances and Storefronts | Entrances...



SAFTI FIRST
100 N Hill Drive
Suite 12
Brisbane, CA 94005
Tel: (888) 653-3333
Fax: (415) 824-5900

info@safti.com

http://www.safti.com/

Find a rep/distributor

Request More Info

DOWNLOADS

Related Products

Overview


GPX Builders Series Fire Protective Framing System

  • 20 to 45 minute fire protective framing system available in multiple profiles.
  • Offered in standard and custom finishes including high performance fluoropolymer finishes by PPG, stainless steel, and more.
Fire Protective Doors
  • 20 to 45 minute fire protective, doors.
  • Tested to NFPA 252, Fire Tests of Door Assemblies.
Available profiles:
Multiple profiles available.

Fire Protective Openings
  • 20 to 45 minute fire protective, openings.
  • Limited to 25% of the total wall area due to radiant heat concerns.
  • Tested to NFPA 257, Fire Tests of Window Assemblies.
Available profiles:
Multiple profiles available.


See More


Sweets app for Revit – Learn More